SR Loop 303 – Happy Valley Parkway to Lake Pleasant Parkway

This new 5.35 mile roadway project, located in Maricopa County and within the City of Peoria, provides the residents of this growing area with an alternative to reach the I-17 freeway. The project scope included more than 2.1 million CY of roadway excavation and more than eight million pounds of reinforced steel, 341,000 SY of Portland Cement Concrete Pavement and 20,000 tons of asphaltic concrete.

Three cast-in-place post-tensioned box girder concrete bridges, six precast, prestressed AASHTO girder concrete bridges, retaining walls, cement stabilized bank protection, a lift station, signing and landscaping, water, reclaimed water and sewer line installation were also included.

  • Company

    Austin Bridge & Road

  • Category

    Concrete Paving