Austin is removing and replacing 1000 feet of asphalt runway at the Robert Gray Army Airfield for the USACE as a concrete paving subcontractor. Our scope includes removal of the existing asphalt runway pavement and base material then installing new underdrain, subbase, rigid base and 17” of concrete pavement. We are using our own concrete batch plant to produce the 10,500 cubic yards of concrete required.