Elm Fork
- Project Name
- Elm Fork
- Project Type
- Railroad
- City
- Dallas
- State
- Texas
- County
- Dallas
- Region
- Texas North
- Owner Name
- Dallas Area Rapid Transit
- Cost
- $9,200,000
- Description
-
Austin constructed two steel truss railroad bridges over the Elm Fork of the Trinity River. Project also included a 3 span railroad bridge over Regal Row with vehicular traffic. INNOVATIVE APPROACH: In lieu of trucking, Austin railed in the H piles, which allowed longer segments to be transported. This minimized the number so required splices and saved time. A process for locking and tagging out equipment was developed to eliminate long equipment transport each day resulting in cost and schedule savings.